Another lovely customer asked us to remove her bath and replace it with a walking shower.
Entire installation took place over a week. The customer is now much happier been able to access the bath and shower in a safer environment.
We recently finished the installation of a Tepeo electric boiler.
The installation of this electric boiler was coupled with a new hot water tank system as the customer was updating from the original
Finished Kitchen Project Late 2022.
Apologies for the length of time it's taking me to update the website, the following represents a recent kitchen project we were asked to complete. As
Under the tiling we found that the existing lime plaster was already coming away from the wall and this was fundamentally the reason why the previous occupants had decided to tile over the existing tile.
The customer came up with a cracking design of Mono-White and Black Theme with rectangular and hexagon tiling. Sanitaryware mostly came from Better Bathrooms and was of good quality.